AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Does ilift work1/17/2024 The I Lift NY super crane arrived in New York harbor over the winter after a 6,000-mile journey from San Francisco. All systems will be restarted, warmed up and tested before they are ready to be used on the project. All non-essential systems were shut down on the vessel, while the rest were put into a special mode to conserve energy and preserve minimum electrical requirements. The super crane is a complex piece of machinery with generators and mechanical systems that were carefully shrink-wrapped and covered with tarps to protect them from corrosive sea-water while in transit to New York Harbor. Afterward, the machine will be rigorously tested for load capacity and safety before making its way up the Hudson River. This process includes revving up the onboard systems and inspecting every inch of the machine to ensure I Lift NY will be in proper working order. I Lift NY is currently moored downriver in Jersey City, where the team is modifying the super crane for work on the New NY Bridge project. When it arrives on the project site, the massive machine will raise large sections of the bridge at once, saving the project team time and money. As pile driving continues on the river, dock builders, carpenters, welders, iron workers, mechanics and masons are preparing materials off-site.Īll of these endeavors are in preparation for the team’s biggest player, the I Lift NY super crane. Tappan Zee Constructors, LLC (TZC) will double its work force in the coming months, with new hires and contractors already bustling over the thawed Hudson River. The New NY Bridge team is ramping up construction as spring breathes new life into the project site. The I Lift NY super crane is currently undergoing preparations for its job on the New NY Bridge project.
0 Comments
Read More
Leave a Reply. |